The construction of the extreme event swales to serve Northern Point subdivision will proceed as soon as CenterPoint lowers a gas line at both of the swale locations. Once the gas lines are moved, the contractor will be able to finalize the project.
The construction of the extreme event swales to serve Northern Point subdivision will proceed as soon as CenterPoint lowers a gas line at both of the swale locations. Once the gas lines are moved, the contractor will be able to finalize the project.